Preventing Failure With Partial  Discharge Testing

Partial discharge inception voltage is one of the most important parameters used to characterise partial discharge. If the PDIV measurement at the new frequency is higher than at 50/60 Hz, it may create false negatives... - Henning Oetjen

Reliable Cable for Industry

Constant advances in materials, test standards and procedures ensure reliability and predictability.

Testing Procedure For Cable Manufacturing Plants

After installation and commissioning, all the functions as per individual elements and their interconnected wiring is required to be checked under cold test, i.e.,...

UG Cable

Underground cables help in ensuring uninterrupted power supply that are hitherto uncommon in overhead systems. The main hindrance in ensuring uninterrupted power supply through overhead systems is the non-availability of space in developed urban areas. - Dr B S Sreekanthan, M Shravanth Vasisht
- Advertisement -

Latest article

Power Sector in 2019 & Beyond

Indian power sector is poised to attract investments worth Rs 11,55,652 crore between 2017 and 2022. Let’s see what’s in store for power sector in 2019 and beyond. By Subhajit Roy, Group Editor

A Long Way to Go for Smart Meters

Smart metering is still in its infancy, as there is no large-scale execution of smart metering system. It is required to start progressing of customers, wherein an end user can get the return on investment (RoI) of smart meter. – Supriya A Oundhakar, Associate Editor