- Advertisements -
- Advertisements -

Case Studies

Electricity, Transformers, Motors, Switchgear, Cables, electrical wires, Meter & Measuring Instruments | Parallel Operation of Transformers - Electrical India Magazine on Power & Electrical products, Renewable Energy, Transformers, Switchgear & Cables

Parallel Operation of Transformers

Loading considerations for paralleling transformers are simple unless kVA, percent impedances, or ratios are different. - Jignesh Parmar
Case Study Efacec Power Transformers Testing Transformer

A CASE STUDY: EFACEC

Carlos Carvalho, Director of Technology at EFACEC, discusses the benefits of software modelling in the design and test of transformers.

ENERGY MONITORING IN COMMERCIAL ESTABLISHMENTS

Moving towards achieving most efficient use of energy, many programs have been brought out by Govt. of India to monitor and manage energy use...

Capacitance & Tan Delta Measurement of POWER TRANSFORMERS

A significant proportion of failures in electrical devices result from the deterioration of insulation. The implementation of routine, straightforward tests, along with prompt maintenance...

Benefits of HVDS for Agriculture

Implementation of high voltage distribution system (HVDS) for agriculture consumers will result in reduction in losses, increase in energy saving and improve voltage profile.

Design Reviews & Life Management Concepts

This paper explains importance of specifications, design reviews and life management concepts for reliable, uninterrupted and intended application of transformers throughout the life cycle. The specification forms the basis on which the manufacturer designs, manufactures and tests a transformer…- S. Kundu, P M Yadav, Ratnesh Talesara

Case Studies Of The Transformers Failure Analyses

Collection of failure data is the first major task. In free repair service or in repair contract, very little effort is made by utilities to find out the root cause of failure, which could be one of the reasons why a damaged transformer is replaced by a new one without removing the cause of damage, leading to failure immediately or within a very short period... - Manish N Sinha, Palak Patel, Parth Shah, Maulik Doshi, Nishith Bhalodiya
- Advertisements -

Recent Post

“Kusam-Meco” AC / DC 60,000 Counts 100 kHz Trms Digital Multimeter Model –...

KUSAM-MECO has introduced a new exciting Digital Multimeter Model KM 789 to its large range of High Safety “UL” listed Multimeters. ‘UL’ listed multimeters...

Fluke Unveils New Line of Acoustic Imagers with ii915, ii905, and ii500

Fluke revolutionized industrial leak detection five years ago with the introduction of its first sonic imager featuring SoundSight™ technology. This innovative tool transformed how...

Solar Assisted Bicycles Part 3

METs are commonly used by clinicians, health educators, and researchers to define, recommend, and prescribe physical activity levels. They can be used to: ...

Innovations in Wind Energy Handling: Schmalz’s Integrated Solutions for Rotor Blade Manufacturing

As the demand for renewable energy sources grows, wind power is becoming an increasingly significant contributor to the global energy mix. A crucial component...

FLIR CM276 Clamp Meter and Thermal Imaging Camera with METERLiNK

Key Features: Reduces inspection and troubleshooting time for solar photovoltaic, electrical, and mechanical systems with its advanced thermal and visual camera. ...