As per the National Tariff Policy, it is envisaged that the targets for Solar RPO (Renewable Purchase Obligation) shall be 0.25% by 2012-13 extending to 3% by 2022. The Jawaharlal Nehru National Solar Mission has been the first step towards achieving these targets. The following table illustrates the Solar RPO requirement by 2022 on the basis of expected demand in India.
Recent Post
World First: ESD-Certified Dress Pack for Maximum Safety in Electronics Production
igus launches triflex TRE ESD, the world’s first ready-to-connect dress pack for industrial robots that is now ESD-certified, including all connection elements. The solution...
ANDRITZ Receives Order from Adani Green Energy for 1500 MW Pumped Storage Project in...
International technology group ANDRITZ has received an order from Adani Green Energy
Limited (AGEL), India’s largest renewable energy company and a leading global player to...
Driving Precision and Efficiency: Schmalz Gripping Systems for India’s Diverse Automated Manufacturing Future
As India rapidly embraces Industry 4.0, automation and robotics are no longer optional—they are essential tools for increasing productivity, ensuring consistent quality, and staying...
WRTL Signs MoU with Viet Khanh Group of Vietnam
Waaree Renewable Technologies Ltd and Viet Khanh Joint Stock Company have signed a non-binding Memorandum of Understanding (MoU) to execute turnkey EPC works of...
“Kusam-Meco” Partial Discharge Acoustic Imager Model – KM-PDAI
KUSAM-MECO has introduced a new “Partial Discharge Acoustic Imager Model KM-PDAI.
It is an ideal instrument which can be used as a standalone system for...