- Advertisement -
- Advertisements -

Preventing Failure With Partial  Discharge Testing

Partial discharge inception voltage is one of the most important parameters used to characterise partial discharge. If the PDIV measurement at the new frequency is higher than at 50/60 Hz, it may create false negatives... - Henning Oetjen

Reliable Cable for Industry

Constant advances in materials, test standards and procedures ensure reliability and predictability.

Testing Procedure For Cable Manufacturing Plants

After installation and commissioning, all the functions as per individual elements and their interconnected wiring is required to be checked under cold test, i.e.,...

UG Cable

Underground cables help in ensuring uninterrupted power supply that are hitherto uncommon in overhead systems. The main hindrance in ensuring uninterrupted power supply through overhead systems is the non-availability of space in developed urban areas. - Dr B S Sreekanthan, M Shravanth Vasisht

Latest article

Transformers in 2020

The transformers sector is projected to show strong growth in 2020 due to the government’s schemes, increased renewable generation, power evacuation and strengthening of interconnecting grid transmission by Supriya A Oundhakar, Associate Editor