Preventing Failure With Partial  Discharge Testing

Partial discharge inception voltage is one of the most important parameters used to characterise partial discharge. If the PDIV measurement at the new frequency is higher than at 50/60 Hz, it may create false negatives... - Henning Oetjen

Reliable Cable for Industry

Constant advances in materials, test standards and procedures ensure reliability and predictability.

Testing Procedure For Cable Manufacturing Plants

After installation and commissioning, all the functions as per individual elements and their interconnected wiring is required to be checked under cold test, i.e.,...

UG Cable

Underground cables help in ensuring uninterrupted power supply that are hitherto uncommon in overhead systems. The main hindrance in ensuring uninterrupted power supply through overhead systems is the non-availability of space in developed urban areas. - Dr B S Sreekanthan, M Shravanth Vasisht
- Advertisements -

Latest article

Automated Solar Panel Cleaning

The article discusses on different technologies used for PV panel cleaning with their performance in different types of environment. It also discusses about the problems associated with different types of cleaning system. - Dr. L. Ashok Kumar, Madhuvanthani Rajendran

‘Power for All’ can trip on DISCOM woes

Concerted steps needed across distribution value chain to prevent a contagion effect on generation and transmission. - Mayur Patil

Need for Thermal Power Stations Optimisation

The article discusses smart techniques aiming to optimised the operating parameters of plant and facilitating the work of operators and maintenance engineers. - Ashok Upadhyay