- Advertisements -
Home Cable Cable Management (Testing & Data Collection)

Cable Management (Testing & Data Collection)

The Modern Artery of India’s Electric Future

The transmission and distribution sector in India is undergoing a significant transformation, influenced by the need for enhanced efficiency, reliability, safety, and environmental sustainability....

CLT600: Advanced Cable Locator and Tracer Kit

The CLT600 is a reliable, easy-to-use tool for detecting electrical power cables, telecommunication cables, and wires in building applications. Featuring non-contact voltage technology, worklights,...
new partnerships

NEW PARTNERSHIPS: PORTLAND GENERAL ELECTRIC AND DOUGLAS COUNTRY PUD

- The Electrical India Content Team On the 13th of May 2020, Portland General Electric Company and the Douglas Country Public Utility District have partnered...
semi reported Its power and compound fab

SEMI REPORTED ITS POWER & COMPOUND FAB REPORT TO 2024

- The Electrical India Content Team On the 5th of May 2020, SEMI reported its Power & Compound Fab report for the year 2024, in...
schneider electric and aveva extend partnership

SCHNEIDER ELECTRIC AND AVEVA EXTEND PARTNERSHIP TO DELIVER END-TO-END SOLUTION FOR MULTI-SITE AND HYPERSCALE...

- The Electrical India Content Team Schneider Electric and AVEVA, announced their expanded partnership to deliver innovative solutions for the data center market, the companies...
prioritization of power distribution

“PRIVATIZATION OF POWER DISTRIBUTION IN UTS AN EXCITING STEP,” ASSERTS PWC INDIA

- The Electrical India Content team  The Union government’s move to privatize electricity distribution companies (DISCOMs) in the eight Union Territories to ease economic adversity...
Cover Story Pg 19

ON TIDES OF CHANGE: EXPLORING THE KGS IN INDIA

- By the Electrical India content team India presently has an installed wind energy capacity of approximately 37 GW. Also, it has a target of...
International News Pg No 14

SAFETY AT HIGH SPEED WITH THE IGUS E-CHAIN SYSTEM IN THE LINEAR MOTOR ROBOT

- By the Electrical India Content Team Twice as fast and half as heavy: this is what makes the linear motor robot from FIBRO LÄPPLE...
National News Pg No 9

“THE 90,000-CRORE LIQUIDITY INJECTION IS A WELCOME RELIEF FOR FINANCIALLY STRESSED DISCOMS,” SAYS CEO...

- By Ranjana Konatt, Editor (Brand Positioning) On Wednesday, May 13th 2020, Finance Minister Nirmala Sitharaman announced a special scheme for the power distribution sector...
Rupixen Com 5lw6clbzlcg Unsplash

PXIL and its employees contribute towards the PM-CARES Fund

-By Electrical India Content Team Power Exchange India Limited (PXIL) has made its contribution to the Prime Minister’s Citizen Assistance and Relief in Emergency Situations...

New igus e-chain Cables for Seventh Axis on Fanuc Robots

igus has now further expanded its range of e-chain cables for robots with two PUR hybrid cables - CFSPECIAL.792.015 and CFSPECIAL.792.016.

On-line Partial Discharge Monitoring System for High-Voltage Cables

MONCABLO has a modular and expandable architecture that can be easily customized to match customer requirements based on the number of cable accessories to be monitored. It can be used for the simultaneous PD monitoring of short or long cable links, including buried or tunnel cable systems…

Preventing Failure With Partial  Discharge Testing

Partial discharge inception voltage is one of the most important parameters used to characterise partial discharge. If the PDIV measurement at the new frequency is higher than at 50/60 Hz, it may create false negatives... - Henning Oetjen

Reliable Cable for Industry

Constant advances in materials, test standards and procedures ensure reliability and predictability.

Testing Procedure For Cable Manufacturing Plants

After installation and commissioning, all the functions as per individual elements and their interconnected wiring is required to be checked under cold test, i.e.,...

UG Cable

Underground cables help in ensuring uninterrupted power supply that are hitherto uncommon in overhead systems. The main hindrance in ensuring uninterrupted power supply through overhead systems is the non-availability of space in developed urban areas. - Dr B S Sreekanthan, M Shravanth Vasisht

Recent Post

“Kusam-Meco” Battery Internal Resistance Tester MODEL- KM 930

KUSAM-MECO has added one more Battery Testing Meter Model KM 930 to it existing Battery Quality Analyzer. It is light and handy and easy...

Harvesters from Oceans

In order to arrest global warming, more than 110 countries have taken up the most urgent mission to achieve net zero carbon emission by...

Evaluating Transformer Switching Transients: Simulation Study Using EMTP and PSCAD

Understanding the causes, characteristics, and mitigation methods of inrush current is essential for ensuring the reliable operation of power transformers and the stability of...

Schmalz Launches New Vacuum Area Gripping Systems FA-X / FA-M

Schmalz has announced the launch of its latest innovation in vacuum automation: the vacuum area gripping systems FA-X and FA-M. Designed to meet the...

CPX 200 – One Device – Infinite Possibilities

After an amazing developmental journey, we are very excited to launch our solution to current and future industry challenges: the CPX 200. This next-generation...