- Advertisements -

Case Studies

Testing & Certification of M V Circuit Breaker

Due to the continuous increase of power handling capacity, increase in network voltages, continuous design improvements and operational requirements of switchgear. In this article, short circuit test duty requirements of 12kV circuit breaker are discussed. By Yugal Agrawal

Smart Transient Free Switching of Switchgears

In this article a basic duty of a “Controlled Switching Device” in back to back switching of a shunt capacitor banks has been explained. The Transients developed are very high in nature and are very injurious to the circuit breaker used for this duty. A case study, highlighting the need for implementing such device for back to back switching of shunt capacitor banks is also described... - Er K K Murty

Recent Post

Strategic Communications: The Hidden Engine Driving Manufacturing Success

In today’s fast-evolving manufacturing sector, success is no longer defined by innovation and efficiency alone. How effectively an organization communicates—internally and externally—has become equally...

“Kusam-Meco” Autoranging True Rms Digital Multimeter With Data Logging & Pc Interface Model KM...

KUSAM-MECO has introduced a most advanced TRMS Digital Multimeter Model KM 891 having 60,000 Counts with data logging function & PC interface.  It has...

Innovative Strategies for Sustainable Energy Generation – PART 1

Global waste generation has surged due to rapid urbanisation, industrial expansion, and population growth. According to the World Bank’s ‘What a Waste 2.0’ report,...

Mitigating Generator and Primary Equipment Stress Part-2

The DETWFL method uses the arrival times for the initial TW at both terminals, along with the LL and the TWLPT, to calculate the...

Bonding or Earthing of Power Cables

The XLPE Underground Cables (UG cables) have assumed greater importance in the present-day scenario, though, they are much costlier than the OH transmission lines,...