- Advertisements -

Case Studies

Evaluating Transformer Switching Transients: Simulation Study Using EMTP and PSCAD

Understanding the causes, characteristics, and mitigation methods of inrush current is essential for ensuring the reliable operation of power transformers and the stability of...

Evaluating Transformer Switching Transients

Inrush current is a transient phenomenon that occurs when a power transformer is initially energized. It is characterized by a large surge of current...

Capacitance & Tan Delta Measurement of POWER TRANSFORMERS

A significant proportion of failures in electrical devices result from the deterioration of insulation. The implementation of routine, straightforward tests, along with prompt maintenance...

ENERGY MONITORING IN COMMERCIAL ESTABLISHMENTS

Moving towards achieving most efficient use of energy, many programs have been brought out by Govt. of India to monitor and manage energy use...
Case Study Efacec Power Transformers Testing Transformer

A CASE STUDY: EFACEC

Carlos Carvalho, Director of Technology at EFACEC, discusses the benefits of software modelling in the design and test of transformers.
Electricity, Transformers, Motors, Switchgear, Cables, electrical wires, Meter & Measuring Instruments | Parallel Operation of Transformers - Electrical India Magazine on Power & Electrical products, Renewable Energy, Transformers, Switchgear & Cables

Parallel Operation of Transformers

Loading considerations for paralleling transformers are simple unless kVA, percent impedances, or ratios are different. - Jignesh Parmar

Benefits of HVDS for Agriculture

Implementation of high voltage distribution system (HVDS) for agriculture consumers will result in reduction in losses, increase in energy saving and improve voltage profile.

Design Reviews & Life Management Concepts

This paper explains importance of specifications, design reviews and life management concepts for reliable, uninterrupted and intended application of transformers throughout the life cycle. The specification forms the basis on which the manufacturer designs, manufactures and tests a transformer…- S. Kundu, P M Yadav, Ratnesh Talesara

Case Studies Of The Transformers Failure Analyses

Collection of failure data is the first major task. In free repair service or in repair contract, very little effort is made by utilities to find out the root cause of failure, which could be one of the reasons why a damaged transformer is replaced by a new one without removing the cause of damage, leading to failure immediately or within a very short period... - Manish N Sinha, Palak Patel, Parth Shah, Maulik Doshi, Nishith Bhalodiya

Recent Post

“Kusam-Meco” Battery Internal Resistance Tester MODEL- KM 930

KUSAM-MECO has added one more Battery Testing Meter Model KM 930 to it existing Battery Quality Analyzer. It is light and handy and easy...

Harvesters from Oceans

In order to arrest global warming, more than 110 countries have taken up the most urgent mission to achieve net zero carbon emission by...

Evaluating Transformer Switching Transients: Simulation Study Using EMTP and PSCAD

Understanding the causes, characteristics, and mitigation methods of inrush current is essential for ensuring the reliable operation of power transformers and the stability of...

Schmalz Launches New Vacuum Area Gripping Systems FA-X / FA-M

Schmalz has announced the launch of its latest innovation in vacuum automation: the vacuum area gripping systems FA-X and FA-M. Designed to meet the...

CPX 200 – One Device – Infinite Possibilities

After an amazing developmental journey, we are very excited to launch our solution to current and future industry challenges: the CPX 200. This next-generation...