Evaluating Transformer Switching Transients

Inrush current is a transient phenomenon that occurs when a power transformer is initially energized. It is characterized by a large surge of current...

Capacitance & Tan Delta Measurement of POWER TRANSFORMERS

A significant proportion of failures in electrical devices result from the deterioration of insulation. The implementation of routine, straightforward tests, along with prompt maintenance...

ENERGY MONITORING IN COMMERCIAL ESTABLISHMENTS

Moving towards achieving most efficient use of energy, many programs have been brought out by Govt. of India to monitor and manage energy use...
Case Study Efacec Power Transformers Testing Transformer

A CASE STUDY: EFACEC

Carlos Carvalho, Director of Technology at EFACEC, discusses the benefits of software modelling in the design and test of transformers.
Electricity, Transformers, Motors, Switchgear, Cables, electrical wires, Meter & Measuring Instruments | Parallel Operation of Transformers - Electrical India Magazine on Power & Electrical products, Renewable Energy, Transformers, Switchgear & Cables

Parallel Operation of Transformers

Loading considerations for paralleling transformers are simple unless kVA, percent impedances, or ratios are different. - Jignesh Parmar

Benefits of HVDS for Agriculture

Implementation of high voltage distribution system (HVDS) for agriculture consumers will result in reduction in losses, increase in energy saving and improve voltage profile.

Design Reviews & Life Management Concepts

This paper explains importance of specifications, design reviews and life management concepts for reliable, uninterrupted and intended application of transformers throughout the life cycle. The specification forms the basis on which the manufacturer designs, manufactures and tests a transformer…- S. Kundu, P M Yadav, Ratnesh Talesara

Case Studies Of The Transformers Failure Analyses

Collection of failure data is the first major task. In free repair service or in repair contract, very little effort is made by utilities to find out the root cause of failure, which could be one of the reasons why a damaged transformer is replaced by a new one without removing the cause of damage, leading to failure immediately or within a very short period... - Manish N Sinha, Palak Patel, Parth Shah, Maulik Doshi, Nishith Bhalodiya

Recent Post

World First: ESD-Certified Dress Pack for Maximum Safety in Electronics Production

igus launches triflex TRE ESD, the world’s first ready-to-connect dress pack for industrial robots that is now ESD-certified, including all connection elements. The solution...

ANDRITZ Receives Order from Adani Green Energy for 1500 MW Pumped Storage Project in...

International technology group ANDRITZ has received an order from Adani Green Energy Limited (AGEL), India’s largest renewable energy company and a leading global player to...

Driving Precision and Efficiency: Schmalz Gripping Systems for India’s Diverse Automated Manufacturing Future

As India rapidly embraces Industry 4.0, automation and robotics are no longer optional—they are essential tools for increasing productivity, ensuring consistent quality, and staying...

WRTL Signs MoU with Viet Khanh Group of Vietnam

Waaree Renewable Technologies Ltd and Viet Khanh Joint Stock Company have signed a non-binding Memorandum of Understanding (MoU) to execute turnkey EPC works of...

“Kusam-Meco” Partial Discharge Acoustic Imager Model – KM-PDAI

KUSAM-MECO has introduced a new “Partial Discharge Acoustic Imager Model KM-PDAI. It is an ideal instrument which can be used as a standalone system for...