Case Studies

Evaluating Transformer Switching Transients

Inrush current is a transient phenomenon that occurs when a power transformer is initially energized. It is characterized by a large surge of current...

Capacitance & Tan Delta Measurement of POWER TRANSFORMERS

A significant proportion of failures in electrical devices result from the deterioration of insulation. The implementation of routine, straightforward tests, along with prompt maintenance...

ENERGY MONITORING IN COMMERCIAL ESTABLISHMENTS

Moving towards achieving most efficient use of energy, many programs have been brought out by Govt. of India to monitor and manage energy use...
Case Study Efacec Power Transformers Testing Transformer

A CASE STUDY: EFACEC

Carlos Carvalho, Director of Technology at EFACEC, discusses the benefits of software modelling in the design and test of transformers.
Electricity, Transformers, Motors, Switchgear, Cables, electrical wires, Meter & Measuring Instruments | Parallel Operation of Transformers - Electrical India Magazine on Power & Electrical products, Renewable Energy, Transformers, Switchgear & Cables

Parallel Operation of Transformers

Loading considerations for paralleling transformers are simple unless kVA, percent impedances, or ratios are different. - Jignesh Parmar

Benefits of HVDS for Agriculture

Implementation of high voltage distribution system (HVDS) for agriculture consumers will result in reduction in losses, increase in energy saving and improve voltage profile.

Design Reviews & Life Management Concepts

This paper explains importance of specifications, design reviews and life management concepts for reliable, uninterrupted and intended application of transformers throughout the life cycle. The specification forms the basis on which the manufacturer designs, manufactures and tests a transformer…- S. Kundu, P M Yadav, Ratnesh Talesara

Case Studies Of The Transformers Failure Analyses

Collection of failure data is the first major task. In free repair service or in repair contract, very little effort is made by utilities to find out the root cause of failure, which could be one of the reasons why a damaged transformer is replaced by a new one without removing the cause of damage, leading to failure immediately or within a very short period... - Manish N Sinha, Palak Patel, Parth Shah, Maulik Doshi, Nishith Bhalodiya

Recent Post

“Kusam-Meco” 1000V DC Hand Held Digital Insulation Resistance Tester Model- KM 372

KUSAM-MECO has added a new hand-held digital Insulation Resistance Tester cum Digital Multimeter for the convenience of electricians.  The instrument combines elegance, ergonomic design...

Innovative Strategies for Sustainable Energy Generation PART 2

Bio power & WTE generation in India Bioenergy refers to the energy derived from biological sources, known as biomass. Biomass is any organic material that...

Push-X: The new milestone in connection technology by Phoenix Contact

The XT and XTV terminal blocks feature Push-X technology. The new technology enables the tool-free connection of rigid and flexible conductors with and without...

Tata Power and Tata Passenger Electric Mobility Ltd. Unveil India’s Largest TATA.ev MegaCharger Hub

Tata Power, in association with Tata Passenger Electric Mobility Ltd, has inaugurated Mumbai’s first premium, large-scale EV charging hub under the TATA.ev MegaCharger initiative....

Engineering a Complete Power Transmission Ecosystem: Power Build’s Full Product Spectrum

Power Build has engineered one of the most diverse and powerful portfolios in mechanical power transmission. Built on decades of precision engineering, reliability, and...